offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›TenneT Hires Hollandse Kust Noord EIA Team
Authorities

February 6, 2017 · about 9 years ago

TenneT Hires Hollandse Kust Noord EIA Team

Transmission systems operator TenneT has contracted Arcadis and Pondera Consult to carry out an Environmental Impact Assessment (EIA) of an offshore grid which will deliver electricity generated at the 700MW Hollandse Kust Noord offshore wind farm zone to the Dutch grid.

1 minutes read
  • LinkedIn
  • X
  • Email

Transmission systems operator TenneT has contracted Arcadis and Pondera Consult to carry out an Environmental Impact Assessment (EIA) of an offshore grid which will deliver electricity generated at the 700MW Hollandse Kust Noord offshore wind farm zone to the Dutch grid.

The EIA will be carried out to provide insights into the effects of subsea cable routes, possible landfall sites, onshore cable routes, and possible locations for an onshore transformer station which will be connected to the national grid via an existing power station.

The findings will be used to determine the final location of the wind farm zone’s offshore and onshore grid infrastructure.

This is the second time Arcadis and Pondera will jointly carry out an EIA for an offshore grid, having previously worked on the Borssele project.

Hollandsee Kust Nord is one of three offshore wind areas chosen by the Dutch government to be developed by 2023, as part of the country’s Energy Agreement for sustainable growth. The three areas, Borssele, Hollandse Kust Zuid and Hollandse Noord have a total capacity of 3,500MW.

The Hollandse Kust Noord consists of two 350MW offshore wind farm sites. The subsidy and permit tender for the sites is scheduled for 2019.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesContracts & TendersEnvironmentGrid ConnectionR&DWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago