offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Sea Fox Returns from Nordergründe Duty
Grid Connection

February 14, 2017 · about 9 years ago

Sea Fox Returns from Nordergründe Duty

Enviro-Serve’s wind farm support vessel (WFSV) Sea Fox has returned to the company’s Lowestoft shore base after working for Norddeutsche Seekabelwerke (NSW) GmbH providing 24-hour support for their inter-array cable installation at the Nordergründe offshore wind farm in the German North Sea. Through

1 minutes read
  • LinkedIn
  • X
  • Email

Enviro-Serve’s wind farm support vessel (WFSV) Sea Fox has returned to the company’s Lowestoft shore base after working for Norddeutsche Seekabelwerke (NSW) GmbH providing 24-hour support for their inter-array cable installation at the Nordergründe offshore wind farm in the German North Sea.

Throughout the 9-month contract the 24-metre vessel worked out of the port of Wilhelmshaven in Germany.

The vessel will undergo a short period of planned maintenance carried out by the company’s engineering team before commencing her summer work campaign.

The offshore wind farm is being constructed at a water depth of 10m, approximately 15km north-east of the island of Wangerooge.

The 110MW wind farm, developed by wpd, will feature 18 Senvion’s 6.15MW turbines.

At the end of December 2016, MPI Enterprise completed the installation of the 18 turbines at the site.

Initially planned to be commissioned by the end of 2016, the wind farm will be put into full operation in the second quarter of 2017.

The commissioning was postponed due to BVT, the company in charge of the wind farm’s substation, entering insolvency.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago