offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Nordsee One Turbines Taking Shape (Gallery)
Vessels

March 8, 2017 · about 9 years ago

Nordsee One Turbines Taking Shape (Gallery)

innogy SE has shared several photos showing the installation of the first and the second Senvion 6.2M126 turbine at the 332ME Nordsee One offshore wind farm in the German North Sea.

1 minutes read
  • LinkedIn
  • X
  • Email

Nordsee One GmbH has shared several photos showing the installation of the first and the second Senvion 6.2M126 turbine at the 332MW Nordsee One offshore wind farm in the German North Sea.

The wind farm will comprise 54 turbines installed some 40 kilometres north off the island of Juist and scheduled for commissioning in by the end of 2017.

The two sets of wind turbines, each consisting of a fully assembled steel tower, a nacelle and a pre-assembled rotor, were loaded onto the installation vessel MPI Enterprise at the Port of Eemshaven last week.

The nacelles weigh around 335 tonnes and are equivalent in size to a detached single-family home. The turbine towers measure almost 70 metres overall in length, and weigh over 240 tonnes. Each rotor blade is 61 meters in length and weighs approximately 20 tonnes.

Nordsee One is owned by Northland Power Inc. (85%) and innogy SE (15%).

Photos: innogy SE

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago