offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Environment›Galloper Crew Enters Final Stretch at Sizewell Beach
Environment

March 10, 2017 · about 9 years ago

Galloper Crew Enters Final Stretch at Sizewell Beach

The final phase of Galloper construction work at Sizewell beach in Suffolk is about to get underway, according to Galloper Wind Farm Limited (GWFL), the developer of the 336MW offshore wind project.

2 minutes read
  • LinkedIn
  • X
  • Email

The final phase of Galloper construction work at Sizewell beach in Suffolk is about to get underway, according to Galloper Wind Farm Limited (GWFL), the developer of the 336MW offshore wind project.

From Monday, 13 March, the construction area will be re-established at Sizewell beach where the Galloper team is preparing for the installation of the second and final export cable that will bring the power generated from the offshore wind farm to the onshore substation that will connect to the National Grid.

The works will be completed, and the site demobilized this summer, with the beach being returned to its original condition, GWFL said.

Ahead of the works, the project team has hosted a Galloper Local Liaison Committee meeting, sent newsletters to local residents, and this weekend, will be hosting public information drop-in sessions in Sizewell that have been advertised in the newsletters and local media.

Work is also continuing at the substation construction site north of Sizewell Gap Road and offshore, 40 of the 56 turbine foundations have now been installed. The installation of the 56 6MW Siemens turbines is expected to start in the early summer of 2017.

Galloper offshore wind farm, located approximately 30 kilometres off the coast of Suffolk, is an extension of the existing and fully operational Greater Gabbard wind farm and represents an expected investment potential of around GBP 1.5 billion.

innogy SE is leading the development and construction of the project on behalf of its partners who also include the UK Green Investment Bank, Siemens Financial Services and Macquarie Capital.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

EnvironmentGrid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago