offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›MME Group to Keep Norther OWF Corrosion Free
Business & Finance

March 14, 2017 · about 9 years ago

MME Group to Keep Norther OWF Corrosion Free

Van Oord has awarded the Dutch corrosion prevention specialist MME Group with a contract to provide cathodic protection for 44 monopiles and the offshore substation to be installed at the 370MW Norther offshore wind farm in the Belgian North Sea.

2 minutes read
  • LinkedIn
  • X
  • Email

Van Oord has awarded the Dutch corrosion prevention specialist MME Group with a contract to provide cathodic protection for 44 monopiles and the offshore substation to be installed at the 370MW Norther offshore wind farm in the Belgian North Sea.

MME Group will engineer, supply and commission internal and external Impressed Current Cathodic Protection (ICCP) systems for the monopiles and the substation.

Pieter Moerland, General Manager of MME Group’s Cathodic Protection division, said: “After successful delivery and operation of our ICCP systems for the largest German and Dutch OWFs (Bard Offshore 1 & Gemini) we are now honoured to contribute to “A Longer Life” for Belgium’s largest OWF. With more than 10 European OWFs protected by our systems, this deal is a clear demonstration of our dedication to customer oriented, high-quality solutions paying off.”

The Norther wind farm is located within the Exclusive Economic Zone of Belgium, approximately 23 kilometres from the Belgian port of Zeebrugge. The wind farm will comprise 44 MHI Vestas 8MW turbines optimised to deliver a maximum output of 8.4MW.

Van Oord is the main contractor for engineering, procurement, supply and installation of the foundations, the offshore substation, and the inter-array and export cables.

The project is owned by Norther N.V. a joint venture between Elicio and Boreas with three sponsors: Elicio N.V. (50%), Eneco (25%) and Mitsubishi Corporation (25%) .

The construction is expected to start in 2018. When commissioned in 2019, Norther will be Belgium’s largest wind farm.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceTechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago