offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›BAM Nutall Installs Final Roof Panel on Blyth Demo Foundations
Technology

March 29, 2017 · about 9 years ago

BAM Nutall Installs Final Roof Panel on Blyth Demo Foundations

BAM Nutall has completed the roof panel installation on the five self-installing gravity base foundations being constructed for EDF Energy Renewables’ 41.5MW Blyth Offshore Demonstrator (BOD) wind farm.

1 minutes read
  • LinkedIn
  • X
  • Email

BAM Nutall has completed the roof panel installation on the five self-installing gravity base foundations being constructed for EDF Energy Renewables’ 41.5MW Blyth Offshore Demonstrator (BOD) wind farm.

Royal BAM Group won a contract to design, fabricate and install five full-size gravity base foundations on the offshore wind farm located 5.7km off the coast of Blyth, Northumberland.

The foundation design utilises ‘self-installing’ technology, which has been developed by two BAM companies, BAM Nuttall and BAM Infra. The design of the foundations was undertaken by BAM Infraconsult.

The foundations are built in the Neptune dry dock on the Tyne and will then be floated and sunk into position using tugs.

The project is due for completion during summer 2017.

The development has consent for up to 15 turbines.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

TechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

18 days ago