offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Environment›Freddie S Joins Westermost Rough Birdwatching Club
Environment

April 13, 2017 · about 9 years ago

Freddie S Joins Westermost Rough Birdwatching Club

Windwave Workboats’ 18-metre Wind Farm Support Vessel (WFSV) Freddie S has completed her first bird survey assisting Jubilee Fishing on the Dong Energy operated Westermost Rough wind farm.

1 minutes read
  • LinkedIn
  • X
  • Email

Windwave Workboats’ 18-metre Wind Farm Support Vessel (WFSV) Freddie S has completed her first bird survey assisting Jubilee Fishing on the Dong Energy operated Westermost Rough wind farm.

Freddie S spent a day performing multiple 10 knot passes around and through the wind farm, Windwave Workboats said.

This is not the first time for Freddie S to work on the Westermost Rough. In June 2016, Siemens chartered the WFSV to provide 24-hour jack-up support during maintenance works.

The Westermost Rough wind farm comprises 35 Siemens SWT-6.0-154 6MW wind turbines installed some 8 kilometres off the Yorkshire Coast, covering a total area of 35km2. The wind farm was inaugurated in July 2015.

The 210MW Westermost Rough is a joint venture between DONG Energy (50%), Marubeni Corporation (25%) and the UK Green Investment Bank (25%).

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

EnvironmentOperations & MaintenanceR&DVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

11 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

11 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago