offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›ZTT Delivers Binhai North Offshore Wind Farm Cables
Grid Connection

April 14, 2017 · about 9 years ago

ZTT Delivers Binhai North Offshore Wind Farm Cables

Chinese cable maker ZTT Group has delivered a 220kV submarine composite cable for the 400MW Binhai North Phase 2 offshore wind farm in the Jiangsu province.

1 minutes read
  • LinkedIn
  • X
  • Email

Chinese cable maker ZTT Group has delivered a 220kV submarine composite cable for the 400MW Binhai North Phase 2 offshore wind farm in the Jiangsu province.

Back in November 2016, China Power Complete Equipment Co. (CPCEC) accepted ZTT Group’s CNY 298 million (EUR 40.8 million) bid to provide 35kV and 220kV cables and accessories for the wind farm.

The cables and the accessories are manufactured in ZTT’s submarine cable factory in Jiangsu.

The Binhai North Phase 2 is being developed by the State Power Investment Corporation (SPIC). The wind farm comprises 100 4MW wind turbines and a 400MW substation which will be installed some 22 kilometres off the coast.

Back in May 2016, Danish engineering, design and consultancy company Ramboll won a contract to design the wind farm.

April 5, ZTT supplied 3C 220kV submarine composite cable to 400MW offshore wind farm project refreshing the delivery length record of China. pic.twitter.com/bb0rppyhtm

— ZTT GROUP (@ZTTGROUP) April 14, 2017

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago