offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Windea Leibniz Puts RangeGuard Monopole Through Its Paces
Operations & Maintenance

April 21, 2017 · about 9 years ago

Windea Leibniz Puts RangeGuard Monopole Through Its Paces

Guidance Marine’s RangeGuard Monopole system has completed its sea trials on-board the Service Operation Vessel (SOV) Windea Leibniz on the Sandbank offshore wind farm in Germany.

2 minutes read
  • LinkedIn
  • X
  • Email

Guidance Marine’s RangeGuard Monopole system has completed its sea trials on-board the Service Operation Vessel (SOV) Windea Leibniz on the Sandbank offshore wind farm in Germany.

As a result, a complete RangeGuard Monopole system was installed on Windea Leibniz. A fully DP integrated system is already on-board Windea Leibniz’s sister vessel, Windea La Cour.

The RangeGuard Monopole system is designed to provide an environmentally referenced position for dynamic positioning at sites where there will be a single, simple monopole in the sensors’ field of view. Typically, this would be on an offshore wind farm, where an SOV would approach a monopile wind turbine to deploy a motion stabilised gangway for crew transfer purposes.

A vessel approaches an offshore wind turbine on DP and, typically, uses differential GPS and a laser PRS to obtain precise position. If poor quality reflector targets are installed on the wind turbine it can lead to the laser sensor detecting false reflections due to their proximity to other highly reflective surfaces, such as the high vis jackets of workmen on the landing platform and walk-to-work gangway. To overcome this problem, high quality reflective prism targets should replace low quality reflectors, but the cost of installing these on every single wind turbine in a wind farm can be prohibitive. RangeGuard Monopole removes the need for installed targets altogether, Guidance Marine said.

“Removing the need for physical targets altogether is a step change in wind farm navigation. A step change being driven by the RangeGuard Monopole system,” Andrew Stead, Head of Sales & Business Development at Guidance Marine, said.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceTechnologyVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago