offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Offshore Structures Britain Ships Out Final Walney Extension Transition Pieces
Wind Farm Update

May 4, 2017 · about 9 years ago

Offshore Structures Britain Ships Out Final Walney Extension Transition Pieces

Offshore Structures Britain (OSB) has shipped out the last six transition pieces built for DONG Energy’s Walney Extension offshore wind farm.

1 minutes read
  • LinkedIn
  • X
  • Email

Offshore Structures Britain (OSB) has shipped out the last six transition pieces built for DONG Energy’s Walney Extension offshore wind farm.

OSB, a Teesside-based joint venture between EEW SPC and Bladt Industries, has now delivered a total of 40 transition pieces for the project which will comprise 87 turbines, with Bladt Industries producing the remaining 47 TPs.

The 660MW Walney Extension is located off the west coast of England, next to the 367.2MW Walney offshore wind farm.

The wind farm will consist of 40 8MW MHI Vestas and 47 7MW Siemens wind turbines and will be the largest wind farm in the world when built and commissioned in 2019.

OSB, which was officially opened in September 2015 , also fabricated 16 transition pieces for the recently fully commissioned Burbo Bank Extension, the first commercial offshore wind farm to feature 8MW turbines.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

18 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

19 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

20 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

18 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

19 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

20 days ago