offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›HR Wallingford Carrying Out Scour Protection Modelling for EA1
Wind Farm Update

May 8, 2017 · about 9 years ago

HR Wallingford Carrying Out Scour Protection Modelling for EA1

HR Wallingford is currently conducting physical modelling in its Fast Flow Facility to test the scour development and the performance of a frond mat scour protection system to protect the jacket piles for the East Anglia ONE offshore wind farm.

2 minutes read
  • LinkedIn
  • X
  • Email

HR Wallingford is currently conducting physical modelling in its Fast Flow Facility to test the scour development and the performance of a frond mat scour protection system to protect the jacket piles for the East Anglia ONE offshore wind farm.

The company is taking into account the foundation design, the seabed characteristics and metocean conditions.

The East Anglia ONE offshore wind farm, located approximately 30 miles southeast of Lowestoft and entering the construction phase, will comprise 102 turbines, mounted on piled jacket foundations.

Initial tests, undertaken at a scale of 1:2, are some of the largest scour tests ever undertaken in a laboratory, and highlight the power and scale of the Fast Flow Facility, which at 75m long and 8m wide can hold a million litres of water and can generate waves up to 1m high and flows of over 2 m/second, HR Wallingford said.

In the tests, jacket legs are protected with weighted frond mats. The mats are composed of high tensile strength, polypropylene, buoyant, frond lines. The frond mats are designed to mimic naturally formed seaweed, providing additional drag and slowing the flow of water. This reduction in velocity reduces the sediment carrying capacity of the water, resulting in a reduction in the erosion rate of material around the jacket legs, or in deposition.

The weight and time development of sediment build-up of the sediment bank will depend on the local conditions and seabed composition.

A series of three full tidal cycles, including both flood and ebb tides, are being simulated to allow the mats to accumulate sediment. Storm conditions are also being run, in which a 1:1 year, 1:10 year, and 1:50 year storm are simulated.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

19 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

20 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

19 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

20 days ago