offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›EnBW Greenlights Albatros Offshore Wind Farm Project
Business & Finance

May 9, 2017 · about 9 years ago

EnBW Greenlights Albatros Offshore Wind Farm Project

The Supervisory Board of EnBW has made the final investment decision for the 112MW Albatros offshore wind farm project in the German North Sea.

1 minutes read
  • LinkedIn
  • X
  • Email

The Supervisory Board of EnBW has made the final investment decision for the 112MW Albatros offshore wind farm project in the German North Sea.

The Albatros wind farm is located near the 497MW EnBW Hohe See wind farm for which the final investment decision was made in December 2016.

The two wind farms will be constructed as a joint project and are expected to be commissioned by 2019.

Albatros will feature 16 turbines of type Siemens SWT-7.0-154 installed across a 11-square-kilometre area in the so-called “exclusive economic zone” of the North Sea.

EnBW acquired the Albatros offshore wind project in December 2014 .

The initial project had an approval for the installation of 79 wind turbines of the 5-7 MW rating class.

However, due to legal limit for the grid connections related to the expansion of offshore wind power by 2020, the number of wind turbines was at the time reduced to 19.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

18 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

18 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

19 days ago