offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›SeaRoc Deploys 3 SeaHub Containers on Walney Extension
Technology

May 9, 2017 · about 9 years ago

SeaRoc Deploys 3 SeaHub Containers on Walney Extension

SeaRoc Group has has deployed three communication containers on Walney Extension: on board the guard vessel patrolling the offshore construction site, at the Walney Extension construction base in Barrow-in-Furness, and at the substation in Heysham.

2 minutes read
  • LinkedIn
  • X
  • Email

SeaRoc Group has has deployed three communication containers on Walney Extension: on board the guard vessel patrolling the offshore construction site, at the Walney Extension construction base in Barrow-in-Furness, and at the substation in Heysham.

Neil Pittam , Project Manager at SeaRoc Group, said: “The three SeaHub containers deployed for the Walney Extension site follows the initial launch of the unique system on DONG Energy’s Race Bank site earlier this year. Additionally we have also installed two Crew Transfer Terminals on board crew transfer vessels at Burbo Extension and Race Bank. Twenty-three more Crew Transfer Terminals are planned for deployment to support Dong Energy’s portfolio, 18 of which are for Walney Extension.”

The communications system deployed onshore to support the Burbo Extension construction project remains operational and will be combined with DONG Energy’s operational communication system later in 2017.

SeaHub provides round-the-clock monitoring and communications in logistically challenging environments, specifically during construction and operation of wind farms far from shore, SeaRoc said. The container houses all required equipment for reliable communications and logistical data sharing that is then integrated into SeaRoc Group’s marine management system, SeaPlanner. The container also contains several autonomous safety systems including fire suppression, gas detection and temperature control, all of which are monitored using the SeaPlanner software.

In 2016 , DONG Energy chose SeaPlanner as the system provider for their Marine and Helicopter Coordination Centre (MHCC) which will be one centralised hub for their UK offshore wind farm construction and a number of regional MHCCs.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

TechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

17 days ago