offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Photo of the Day: First Wind Turbine at Galloper OWF
News

May 23, 2017 · about 9 years ago

Photo of the Day: First Wind Turbine at Galloper OWF

Innogy UK yesterday posted the first photo of the first wind turbine installed last week at the Galloper offshore wind farm.

1 minutes read
  • LinkedIn
  • X
  • Email

Innogy UK yesterday posted the first photo of the first wind turbine installed last week at the Galloper offshore wind farm.

The Siemens team onboard the wind turbine installation vessel (WTIV) Pacific Orca is installing 56 Siemens 6MW turbines on the 336MW wind farm off Suffolk.

The first turbine was installed on 16 May.

The turbines are being shipped from the purpose-built Siemens’ assembly base at Peel Ports, Great Yarmouth, where the towers are put together and prepared by a 70-strong workforce.

Up to five turbines are being installed on each trip.

The offshore construction phase of the Galloper project started in June 2016 and is expected to be completed in late 2017.

The wind farm is expected to be commissioned in early 2018.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago