offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›VBMS and EDS Launch Prepare to Repair Cable Fault Model
Grid Connection

May 29, 2017 · about 9 years ago

VBMS and EDS Launch Prepare to Repair Cable Fault Model

Subsea power cable installation specialists VBMS and High Voltage engineering company EDS have launched their Cable Integrity Solutions including the “Prepare to Repair” framework which is said to allow cable repairs to be carried out up to 70% faster.

2 minutes read
  • LinkedIn
  • X
  • Email

Subsea power cable installation specialists VBMS and High Voltage engineering company EDS have launched their Cable Integrity Solutions including the “Prepare to Repair” framework which is said to allow cable repairs to be carried out up to 70% faster.

The model promotes critical preparations to be carried out upfront, ensuring that if a cable fails, arrangements are in place and the repair process can be started immediately, massively minimising downtime, VBMS said.

EDS and VBMS discussed the importance of being prepared for potential cable faults during a forum on cable faults held in London last week.

Ryan Henderson, Group Director of EDS said: “Now seemed like an appropriate time for us to set up a forum to collaborate and share the valuable knowledge that we have within the sector. VBMS and EDS have combined their expertise and experience to offer an immediate solution through our Prepare to Repair framework, but ultimately to gather expertise from the wider industry to further develop more long-term cable integrity solutions.”

The forum saw industry experts from CIEG, CODAN, Equitix and Vattenfall give their view on the challenges the industry is facing and potential ways forward.

There was also a demonstration of a cable monitoring system that has the potential to change the way that cables are protected going forward, VBMS said.

“To ensure the long-term sustainability of the industry it is critical that we share best practices moving forward. There have been more subsea cable faults than anyone could have predicted and as an industry we need to come together, get the issues out into the open and come up with short and long term solutions in order to reduce the levelised cost of energy by increasing availability and reliability of cable systems,” Jack Wattel , Director Commerce of VBMS, said.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionOperations & MaintenanceR&DTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

17 days ago