offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›Deep C to Keep Beatrice Piles Soil Free
Technology

June 7, 2017 · about 9 years ago

Deep C to Keep Beatrice Piles Soil Free

Norwegian seabed intervention specialist Deep C has been awarded a contract by Seaway Heavy Lifting (SHL) to perform soil plug removal inside subsea piles, as part of the development of the 588MW Beatrice wind farm off Scotland.

2 minutes read
  • LinkedIn
  • X
  • Email

Norwegian seabed intervention specialist Deep C has been awarded a contract by Seaway Heavy Lifting (SHL) to perform soil plug removal inside subsea piles, as part of the development of the 588MW Beatrice wind farm off Scotland.

Seaway Heavy Lifting will install 84 jackets for the Beatrice wind turbines and two jackets for the offshore transmission modules.

Each jacket sits on four piles, resulting in a total of 344 piles requiring soil removal and internal pile cleaning down to eight metres below the top of pile.

Deep C Group has applied their technology to design, engineer and fabricate a bespoke soil plug removal tool (SPRT) for the project.

The SPRT operates independently and is deployed in a specialised launch & recovery frame which mates and centralises on each pile. The toll is outfitted with both suction, and low / high pressure jetting capability, as well as monitoring systems for depth measurement and inspection.

The SPRT performs soil plug removal, internal pile cleaning and inspection simultaneously, Deep C said.

Onshore testing including Client FAT has been successfully completed, and the equipment is now prepared and mobilised for the first campaign starting in the near future, the company said.

”This is a strategically important Award for Deep C which has given us the opportunity to demonstrate our capability to provide complex bespoke solutions. The design, engineering, fabrication, and equipment testing/ evolution has been completed in record time. This demonstrates the commitment and cooperation of both Seaway Heavy Lifting and Deep C and is a credit to both organisations,” said OddGustav Kvalvåg, CEO of Deep C Group.

SHL started the piling works at the site in the Outer Moray Firth in early April and the operations are scheduled to be completed in October.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

TechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

17 days ago