offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Fred. Olsen Windcarrier Snags Albatros
Vessels

June 8, 2017 · about 9 years ago

Fred. Olsen Windcarrier Snags Albatros

Siemens Gamesa Renewable Energy has awarded Fred. Olsen Windcarrier with a contract to transport and install Siemens Gamesa 7MW turbines at EnBW’s Albatros offshore wind farm.

1 minutes read
  • LinkedIn
  • X
  • Email

Siemens Gamesa Renewable Energy has awarded Fred. Olsen Windcarrier with a contract to transport and install Siemens Gamesa 7MW turbines at EnBW’s Albatros offshore wind farm.

The 112MW Albatros wind farm is located 100 kilometres from shore in the German Exclusive Economic Zone (EEZ). The 16-turbine wind farm is scheduled for commissioning during the second half of 2019.

This project follows on directly from the contract to install the same type of turbines at the neighbouring 497MW EnBW Hohe See wind farm awarded to Fred. Olsen Windcarrier in March 2016.

“This new contract will continue our strong relationship with Siemens Gamesa, emphasising faith in our vessels and future collaboration,” said Martin Degen, Commercial Manager for Fred. Olsen Windcarrier.

“Being awarded this reinforces our prime position in the German North Sea.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

13 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

13 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago