offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›NDE Offshore Keeping Busy at Bard Offshore 1
Operations & Maintenance

June 12, 2017 · about 9 years ago

NDE Offshore Keeping Busy at Bard Offshore 1

Sweden’s NDE Offshore AB is carrying out inspection, maintenance and installation activities at the 400MW Bard Offshore 1 wind farm on behalf of Ocean Breeze Energy.

1 minutes read
  • LinkedIn
  • X
  • Email

Sweden’s NDE Offshore AB is carrying out inspection, maintenance and installation activities at the 400MW Bard Offshore 1 wind farm on behalf of Ocean Breeze Energy.

In March 2017, NDE Offshore was awarded a two-year inspection, repair and maintenance contract with Ocean Breeze Energy. The service contract also includes ICCP works at the wind farm in the German North Sea. The project started in mid-May.

NDE Offshore is using the vessel Ocean Zephyr, equipped with a Walk-to-Work system and an ROV to carry out topside and subsea operations. The campaign comprises of topside inspection, service and installation as well as underwater inspections of the transition pieces. The installation scope, is carried out from a second vessel, Glomar Wave, NDE Offshore said.

David Malmberg, Sales and Marketing Manager at NDE Offshore, said: “This contract demonstrates the strong partnership we have developed with Ocean Breeze over the past years. We are very much looking forward to the continued cooperation.”

Bard Offshore 1 is located 100 kilometers northwest of Borkum and comprises 80 wind turbines.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

13 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

13 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago