offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›DolWin Gamma Topside On the Move
Grid Connection

June 16, 2017 · about 9 years ago

DolWin Gamma Topside On the Move

The topside of the DolWin gamma offshore converter station has sailed out of the Nordic Yard facility in Rostock to the German North Sea, TenneT reports.

1 minutes read
  • LinkedIn
  • X
  • Email

The topside of the DolWin gamma offshore converter station has sailed out of the Nordic Yard facility in Rostock to the German North Sea, TenneT reports.

The DolWin gamma is currently between Rostock and Fehmarn and progresses at a speed between 2 and 5.5 knots. The barge carrying the topside is being towed and accompanied by two vessels from Boskalis’ fleet.

The DolWin gamma offshore platform is part of the 900MW DolWin3 offshore grid connection system which will be installed some 50 kilometres north of Borkum in a water depth of about 30 metres.

DolWin gamma is a daughter platform to the DolWin alpha and will be connected to it via a fixed bridge.

In 2013, TenneT awarded a contract for the supply and construction of the DolWin3 onshore and offshore converter stations as well as the connecting cable systems to Alstom, which in the meantime sold its power and grid businesses to GE.

DolWin3 is being developed to allow secure transfer of renewable energy from the distant wind farms to the mainland with as little loss as possible.

Once completed by the end of this year, the DolWin3 will connect two offshore wind farms from the DolWin cluster to the 400kV substation in Dörpen West.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

22 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

29 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

22 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

29 days ago