offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Bladt Pieces Together First Beatrice Jacket
Wind Farm Update

June 21, 2017 · about 9 years ago

Bladt Pieces Together First Beatrice Jacket

Bladt Industries has completed the stacking of the upper 3D structure to the lower 3D structure on the first of 30 jacket foundations built for the 588MW Beatrice Offshore Windfarm Ltd (BOWL) project.

1 minutes read
  • LinkedIn
  • X
  • Email

Bladt Industries has completed the stacking of the upper 3D structure to the lower 3D structure on the first of 30 jacket foundations built for the 588MW Beatrice Offshore Windfarm Ltd (BOWL) project.

The Danish manufacturer will provide 30 four-legged jacket foundations for the 84-turbine wind farm located in the Outer Moray Firth, Scotland.

The jacket foundations will have a height of up to approximately 70 metres with weights of up to approximately 900 tons – making them significantly larger than previous jackets structures fabricated at Lindoe, Bladt said.

The remaining 54 jacket foundations for the project are being produced by Smulders , and BiFab .

The GBP 2.6 billion BOWL project has been given the green light for construction by owners SSE (40%), Copenhagen Infrastructure Partners (CIP) (35%) and Red Rock Power Limited (25%) after reaching Financial Close in May 2016.

The Beatrice wind farm will comprise 84 Siemens 7MW turbines and is expected to be commissioned in 2019.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

19 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

21 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

19 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

21 days ago