offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›TechnipFMC Installs Hywind Scotland Suction Anchors
Vessels

June 22, 2017 · about 9 years ago

TechnipFMC Installs Hywind Scotland Suction Anchors

Statoil ASA has through contractor TechnipFMC completed suction anchor installation at Buchan Deep approximately 25 kilometres off Peterhead, Scotland, as part of the Hywind Scotland Pilot Park Project.

1 minutes read
  • LinkedIn
  • X
  • Email

Statoil ASA has through contractor TechnipFMC completed suction anchor installation at Buchan Deep approximately 25 kilometres off Peterhead, Scotland, as part of the Hywind Scotland Pilot Park project.

The marine works have been carried out by the offshore construction vessel, Deep Explorer.

All of the 15 anchors are installed at the location and are extending maximum 3 metres above seabed.

Statoil is currently mounting the five Siemens 6MW turbines on their respective SPAR-type floating foundations off Stord, Norway.

The assembled constructions will then be transported to the installation site and anchored in water depths of between 90 and 120 metres.

The 30MW floating wind farm, owned by Statoil (75%) and Masdar (25%), is expected to be commissioned in late 2017.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago