offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Siport21 Studies Safety Conditions in Foundations Transport and Installation
News

June 30, 2017 · about 9 years ago

Siport21 Studies Safety Conditions in Foundations Transport and Installation

Siport21, a Madrid-based port-maritime consultancy company, has presented the “Methodology of the hydrostatic and hydrodynamic analysis of fixed and floating structures for the offshore wind industry”, which allows studying the safety conditions during transport and installation of the support struc

1 minutes read
  • LinkedIn
  • X
  • Email

Siport21, a Madrid-based port-maritime consultancy company, has presented the “Methodology of the hydrostatic and hydrodynamic analysis of fixed and floating structures for the offshore wind industry”, which allows studying the safety conditions during transport and installation of the support structures for offshore wind turbines.

The work is based on a dynamic analysis of gravity-based structures and floating foundations for offshore wind turbines or auxiliary structures. Different tools were used to simulate the behaviour of floating, moored, towed or anchored structures, under the effect of various combinations of wind, waves and currents.

For the assessment, analysis criteria of classification societies such as DNV GL, Lloyd’s, and ABS were used.

Based on the analysis, it was possible to elaborate operation, towing and installation procedures and emergency plans which can be optimised according to meteorological, operational and survival criteria.

Also, the methodology allows for optimisation of the turbine operation, improvement of the geometry of the support structure, and avoiding traffic interference in the area using manoeuvre simulation tools.

The company presented the methodology during the 8th Technical Meeting of the Marine Renewable Energy Working Group.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago