offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Sea Installer Passes Quarter-Way Mark on Race Bank
Vessels

July 7, 2017 · about 9 years ago

Sea Installer Passes Quarter-Way Mark on Race Bank

A2SEA’s jack-up Sea Installer has, together with DONG Energy and Siemens Wind Power, installed 23 out of 91 Siemens 6MW turbines on the 576MW Race Bank offshore wind farm off North Norfolk, UK.

1 minutes read
  • LinkedIn
  • X
  • Email

A2SEA’s jack-up Sea Installer has, together with DONG Energy and Siemens Wind Power, installed 23 out of 91 Siemens 6MW turbines on the 576MW Race Bank offshore wind farm off North Norfolk, UK.

The vessel loaded the first turbine components at the Port of Hull and installed the first turbine at the site some 17 miles off Blakeney Point in early May.

The wind farm produced its first power and started feeding it to the grid mid-May.

DONG Energy’s Race Bank is expected to be fully commissioned in 2018.

Construction of Race Bank is being managed from DONG Energy’s construction base in the Grimsby Fish Docks.

The project update follows a decision by DONG and Siemens to sell full ownership of A2SEA to GeoSea, part of DEME Group.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago