offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Study: No Master Key for Offshore Wind O&M
Operations & Maintenance

July 13, 2017 · about 9 years ago

Study: No Master Key for Offshore Wind O&M

Although Europe has experience and knowledge in O&M of offshore wind farms, the O&M strategies employed in Europe cannot be copied one-on-one in the U.S. or Asia, a recent study carried out by the Energy research Centre of the Netherlands (ECN) and National Renewable Energy Laboratory (NREL) shows.

2 minutes read
  • LinkedIn
  • X
  • Email

Although Europe has experience and knowledge in O&M of offshore wind farms, the O&M strategies employed in Europe cannot be copied one-on-one in the U.S. or Asia, a recent study carried out by the Energy research Centre of the Netherlands (ECN) and National Renewable Energy Laboratory (NREL) shows.

The researchers mapped out effective O&M strategies for six potential offshore wind sites in the U.S. The six U.S. offshore sites considered are in the Atlantic, the Gulf of Mexico, the Pacific and the Great Lakes.

The inputs for wind farm sites and resource characteristics were provided by NREL. ECN’s simulation tool, ECN O&M Calculator v3.0, was used for modelling the O&M studies.

Data was analysed and an optimal O&M strategy for each site and O&M Key Performance Indicators (KPI) determined, including O&M costs and wind farm availability.

Moreover, as an addition to the study, a comparison of O&M KPI’s of the six selected U.S. sites with European offshore farms was also made which showed that there is no one-size-fits-all for offshore wind O&M.

Specifically, the U.S. has various regional aspects like hurricanes and tropical storms in Gulf of Mexico and Atlantic respectively, icing conditions in the Great Lakes and deep water condition in the Pacific, ECN said.

The study also highlights the importance of developing a local supply chain including manufacturing of the vessels for potential markets like the U.S. Else, there can be an expected 18-20% difference in the repair cost between two similar wind farms in the U.S. and Europe.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceR&DTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

17 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

17 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

17 days ago