offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›JB-117 Deployed at DolWin Gamma Site
Grid Connection

July 17, 2017 · about 9 years ago

JB-117 Deployed at DolWin Gamma Site

The self-elevating platform JB-117 has been deployed on the DolWin 3 project in Germany to provide crane support and accommodation services during the float over, installation, hook up and commission of the DolWin gamma converter station topside. Offshore Marine Contractors were appointed by Jack-Up

1 minutes read
  • LinkedIn
  • X
  • Email

The self-elevating platform JB-117 has been deployed on the DolWin 3 project in Germany to provide crane support and accommodation services during the float over, installation, hook up and commission of the DolWin gamma converter station topside. Offshore Marine Contractors were appointed by Jack-Up Barge to provide assistance with the mobilisation of JB-117.

The 18,000-tonne topside was installed on the jacket foundations with the float-over procedure earlier this month .

The JB-117 tow commenced in Vlissingen and set sail to the project location. This was conducted by the 85 tons bollard pull Thor and the 70 tons bollard pull Atlantis.

At the DolWin 3 location, tug Thor provided anchor handling services for the tight tolerance rig move within a complex anchor pattern.

Positioning of the JB-117 within such tight tolerances to both subsea obstructions and the DolWin Alpha substation was successfully performed in close co-operation with Jack-Up Barge and Marine Offshore Designers who provided survey/positioning services, Offshore Marine Contractors said.

DolWin gamma is a daughter platform to the DolWin alpha and will be connected to it via a fixed bridge. The DolWin gamma offshore platform is part of the 900MW DolWin3 offshore grid connection system. Once completed by the end of this year, the DolWin3 will connect two offshore wind farms from the DolWin cluster to the 400kV substation in Dörpen West.

Photos: Capt. Kai Holmroos of tug Thor/ Matthijs van de Ketterij of tug Atlantis.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

17 days ago

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

17 days ago
Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

18 days ago