offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›ABB Lands Voltage Stabilisation Technology Contract for East Anglia ONE
Technology

July 19, 2017 · about 9 years ago

ABB Lands Voltage Stabilisation Technology Contract for East Anglia ONE

ABB has won a USD 30 million (approx. EUR 26 million) order from ScottishPower Renewables to supply two SVC Light® Static Compensators (STATCOMs) to enable voltage stabilisation and enhanced power quality for the East Anglia ONE offshore wind farm.

1 minutes read
  • LinkedIn
  • X
  • Email

ABB has won a USD 30 million (approx. EUR 26 million) order from ScottishPower Renewables to supply two SVC Light® Static Compensators (STATCOMs) to enable voltage stabilisation and enhanced power quality for the East Anglia ONE offshore wind farm.

The technology will smooth out the voltage fluctuations that are an inherent feature of intermittent wind energy, according to ABB. The STATCOMs will increase power transfer capability, improve power quality and enhance grid stability, enabling more energy efficient and reliable power supplies for millions of consumers.

Two advanced ABB TrafoStar™ Autotransformers will be incorporated in the STATCOM system. These compact and low weight transformers are ideal for this type of application as they combine the functionality of two transformers in one, while boosting energy efficiency by significantly reducing the total losses, ABB said.

“ABB’s advanced STATCOM and transformer technologies will not only help stabilize voltage fluctuations and enhance power capacity but also improve the quality and reliability of renewable wind energy supplies to millions of people,” said Patrick Fragman , head of ABB’s Grid Integration business, a part of the company’s Power Grids division.

East Anglia ONE, consisting of 102 Siemens 7MW wind turbines, is scheduled for full commissioning by the end of 2018.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

TechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

17 days ago