offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Heerema Fabrication Group to Build Albatros OTM
Business & Finance

July 27, 2017 · about 9 years ago

Heerema Fabrication Group to Build Albatros OTM

Siemens AG has awarded Heerema Fabrication Group (HFG) a Procurement & Construction contract for the Offshore Transformer Module (OTM) which will be installed at EnBW’s Albatros offshore wind farm.

1 minutes read
  • LinkedIn
  • X
  • Email

Siemens AG has awarded Heerema Fabrication Group (HFG) a Procurement & Construction contract for the Offshore Transformer Module (OTM) which will be installed at EnBW’s Albatros offshore wind farm.

Koos-Jan van Brouwershaven , CEO of Heerema Fabrication Group, said: “Together with Siemens we will go to any lengths to make this project a success and lay the foundation for many similar projects. This project, together with our recently booked Peregrino project for Statoil, brings us closer to our 25% capacity strategy for 2018 and beyond.”

The Albatros offshore wind farm is located 105km off German North Sea coast, in close proximity of the EnBW Hohe See wind farm. Albatros will feature 16 Siemens Gamesa 7MW wind turbines.

Construction of the 1000-tonne OTM is due to start in the first quarter of 2018 at the Heerema yard in Zwijndrecht, the Netherlands, and is expected to be completed by the first quarter of 2019.

The OTM, with a transmission capacity of 116 MW, is one of the main components of the wind farm’s offshore grid connection.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

18 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

19 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

20 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

18 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

19 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

20 days ago