offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Boskalis Starts Working on Rotterdam Offshore Center
News

July 28, 2017 · about 9 years ago

Boskalis Starts Working on Rotterdam Offshore Center

Boskalis has kicked off rainbowing works at the Maasvlakte 2 site, where the Port of Rotterdam is setting up the Rotterdam Offshore Center, dedicated to the offshore wind and oil and gas industries.

2 minutes read
  • LinkedIn
  • X
  • Email

Boskalis has kicked off rainbowing works at the Maasvlakte 2 site, where the Port of Rotterdam is setting up the Rotterdam Offshore Center, dedicated to the offshore wind and oil and gas industries.

The rainbowing is being carried out by Boskalis’ mega cutter Helios, the largest and most powerful cutter suction dredger Boskalis has ever developed, our sister site Dredging Today writes.

The new port site of up to 70 hectares is being created at the Prinses Alexiahaven, along Maasvlakte 2’s inland basin, and is scheduled to become operational within two years from the start of construction works, with the first 30 hectares expected to be delivered in November.

PUMA, or Projectorganisatie Uitbreiding Maasvlakte (Project Organisation Expansion Maasvlakte) – a joint venture between Royal Boskalis Westminster NV and Van Oord NV – is responsible for the first phase of construction works on the site.

The construction of the quay walls will start in mid-2018.

The activities at the Offshore Center will be related to construction, assembly, logistics and heavy lift operations for offshore wind. The center will also cover decommissioning of the oil and gas platforms, as well as the oil and gas market.

The establishment of the first Offshore Center in Europe fits into the Port Authority’s policy to further develop the Rotterdam cluster of companies in the offshore and maritime sectors, the Port said.

During a press conference on the half-year results on 20 July, Allard Castelein, CEO of the Port Authority announced that 25 candidates have already signed up for the Offshore Center.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago