offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›VBMS Completes Three Cable Repairs in UK Waters
Operations & Maintenance

August 14, 2017 · about 9 years ago

VBMS Completes Three Cable Repairs in UK Waters

VBMS has recently repaired two inter-array cables and one export cable in the Thames Estuary and the Irish Sea. VMBS used Stemat 82 to carry out the inter-array cable repairs in the shallow waters of the outer Thames Estuary due to its 8-point mooring system and 2.3m depth. The repair of the export

1 minutes read
  • LinkedIn
  • X
  • Email

VBMS has recently repaired two inter-array cables and one export cable in the Thames Estuary and the Irish Sea.

VMBS used Stemat 82 to carry out the inter-array cable repairs in the shallow waters of the outer Thames Estuary due to its 8-point mooring system and 2.3m depth.

The repair of the export cable was carried out 20 kilometres in the Irish Sea. VBMS acquired a Subsea Universal Joint to connect the replacement and existing cable sections, which was installed by High Voltage engineering specialists EDS.

At the end of May, VBMS and EDS launched their Cable Integrity Solutions, including the ‘Prepare to Repair’ framework, which facilitates preparations being carried out upfront, making sure that arrangements are in place if a cable fails. This way the repair process can start immediately with minimised downtime. The companies estimate that with their solutions cable repair can be accomplished up to 70% faster.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago