offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Van Oord’s Heavy Lifters Team Up on Walney Extension (VIDEO)
Vessels

August 17, 2017 · about 9 years ago

Van Oord’s Heavy Lifters Team Up on Walney Extension (VIDEO)

Van Oord has shared a video of the company’s heavy lift vessels – Aeolus and Svanen – installing the 87 foundations on DONG Energy’s Walney Extension wind farm in the Irish Sea.

1 minutes read
  • LinkedIn
  • X
  • Email

Van Oord has shared a video of the company’s heavy lift vessels – Aeolus and Svanen – installing the 87 foundations on DONG Energy’s Walney Extension wind farm in the Irish Sea.

For this project, Van Oord deployed its 8,000-tonne heavy lift installation vessel Svanen to install 56 monopile foundations. The remaining 31 foundations, together with the transition pieces, were installed by Aeolus. This was the first floating installation of transition pieces for Aeolus.

The Walney Extension wind farm is located in the Irish Sea, some 19 kilometres off Walney Island, Cumbria, UK. It consists of 87 turbines with a total capacity of 659MW.

Once fully commissioned in 2019, Walney Extension will become the world’s largest operating offshore wind farm.

The video below shows a summary of works on Walney Extension.

Video source: Van Oord

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago