offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Tideway Books Normand Jarstein for Merkur Works
Vessels

August 18, 2017 · about 9 years ago

Tideway Books Normand Jarstein for Merkur Works

Tideway B.V, part of the DEME Group, has entered into a charter agreement with SolstadFarstad ASA for the DP2, accommodation and walk-to-work vessel Normand Jarstein.

1 minutes read
  • LinkedIn
  • X
  • Email

Tideway B.V, part of the DEME Group, has entered into a charter agreement with SolstadFarstad ASA for the DP2, accommodation and walk-to-work vessel Normand Jarstein.

The charter is due to start later next month. The vessel will be assisting during pull-in preparations, pull-in operations and cable terminations for 73 inter-array cables at the Merkur offshore wind farm, which is located approximately 45km north of the islands of Borkum, Germany, in the North Sea.

Prior to heading out to Merkur, the vessel was fitted with an Ampelmann E1000 motion compensated gangway.

The 117-metre Normand Jarstein has accommodation for up to 86 passengers, and a maximum PoB capacity of 110.

Merkur offshore wind farm, owned by Merkur Offshore GmbH, will consist of 66 GE Haliade 150-6MW wind turbines.

Tideway is in charge of the installation of the inter-array cables on the wind farm. The company will deploy its new subsea cable installation/trenching vessel Living Stone to carry out the installation works.

The wind farm is expected to be fully commissioned in 2019.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago