offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Cuxhaven Ready For Heavy Offshore Wind Loads
News

August 23, 2017 · about 9 years ago

Cuxhaven Ready For Heavy Offshore Wind Loads

Lower Saxony’s Minister of Economics, Labour and Transport Olaf Lies has inaugurated a new berthing space and a new ramp at the port of Cuxhaven’s offshore terminal.

1 minutes read
  • LinkedIn
  • X
  • Email

Lower Saxony’s Minister of Economics, Labour and Transport Olaf Lies has inaugurated a new berthing space and a new ramp at the port of Cuxhaven’s offshore terminal.

The port now offers 1,340 metres of berthing space at the offshore terminal with water depths of up to 11.6 metres. The new ramp, with a dimension of 115 x 55 meters, will allow for the heavy loads to be loaded directly onto RoRo ships.

“Lower Saxony is a pioneer in power generation in Germany. The German offshore industry center in Cuxhaven is already writing success stories and has boosted the offshore industry. Due to our clever and far-sighted investments in the port infrastructure, we have created optimal conditions for the industry in Cuxhaven in time,” said Minister Lies .

The expansion of the port’s offshore terminal was seen as a natural step after Siemens decided to build a wind turbine factory in Cuxhaven, and after a number offshore wind-related companies established their presence in the area.

The newly added berthing space, Berth 9.3, and the new ramp will be utilised for the transportation and load-out of 20 jacket foundations for DONG Energy’s Borkum Riffgrund 2 wind farm.

The first jackets are expected to arrive from Stettin, Poland, in October and the project is expected to be completed by March 2018.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago