offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›ODE and DORIS Secure French Offshore Wind Contracts
Wind Farm Update

August 24, 2017 · about 9 years ago

ODE and DORIS Secure French Offshore Wind Contracts

ODE and DORIS Engineering, both part of the DORIS Group, have been awarded Owners Engineer contracts covering the wind turbine generator installation and the marine construction management for the Éoliennes en mer Dieppe et Le Tréport and the Iles d’Yeu et de Noirmoutier wind farms off France.

1 minutes read
  • LinkedIn
  • X
  • Email

ODE and DORIS Engineering, both part of the DORIS Group, have been awarded Owners Engineer contracts covering the wind turbine generator installation and the marine construction management for the Éoliennes en mer Dieppe et Le Tréport and the Iles d’Yeu et de Noirmoutier wind farms off France.

The Éoliennes en mer Iles d’Yeu and Noirmoutier consortium brings together Engie, EDP Renewables and Caisse des Dépôts to develop these projects.

The 496MW Dieppe et Le Tréport offshore wind farm is located 16km from Dieppe and 15km from Tréport, in water depth ranging from 5 to 25 meters. The 496MW Iles d’Yeu et de Noirmoutier offshore wind farm project is located 11.6km from the island of Yeu and 16.5km from Noirmoutier, in water depths varying from 17 to 35 meters.

Each project will use 62 of the Adwen 8MW turbines.

The contract will see ODE provide engineering and project management support for the wind turbine generator installation and for the marine construction management from ODE’s offices in central London and from the DORIS Group headquarters in Paris.

Construction and installation of Dieppe et Le Tréport and Iles d’Yeu et de Noirmoutier wind farms will begin in 2019 and commissioning is expected in 2021, with the wind farm remaining in operation until 2041.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

20 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

21 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

20 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

21 days ago