offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›MHI Vestas 8MW Turbines House SPM’s Condition Monitoring System
Operations & Maintenance

September 15, 2017 · about 9 years ago

MHI Vestas 8MW Turbines House SPM’s Condition Monitoring System

MHI Vestas had installed SPM Instrument’s Intellinova Parallel MB condition monitoring system on the 8MW wind turbines, 32 of which were erected at the Burbo Bank Extension offshore wind farm, according to SPM’s article from 11 September.

1 minutes read
  • LinkedIn
  • X
  • Email

MHI Vestas had installed SPM Instrument’s Intellinova Parallel MB condition monitoring system on the 8MW wind turbines, 32 of which were erected at the Burbo Bank Extension offshore wind farm, according to SPM’s article from 11 September.

Prior to the installation on MHI Vestas commercial units, the system was tested and evaluated over an extended period at the V164 test site in Østerild in northern Denmark.

SPM states that Intellinova Parallel MB is very well suited for managing the special operating conditions of wind turbines, including very low rotational speeds. The system consists of four channels measuring in parallel, and three shock pulse transducers of type 44000 connected to the measuring system to monitor the turbine’s two main bearings and the rotor side bearing of the planetary gearbox.

Since its launch in 2015, the V164-8MW turbine has been uprated, and the currently most powerful serially produced wind turbine is now the V164-9.5MW .

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

17 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

17 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

17 days ago