offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Smulders Piecing Together EOWDC Suction Bucket Jacket Foundations (Video)
Wind Farm Update

September 15, 2017 · about 9 years ago

Smulders Piecing Together EOWDC Suction Bucket Jacket Foundations (Video)

Belgian steel foundations specialist Smulders has shared a video showing the construction of the eleven suction bucket jacket foundations for Vattenfall’s European Offshore Wind Deployment Centre (EOWDC) in Aberdeen Bay, Scotland.

1 minutes read
  • LinkedIn
  • X
  • Email

Belgian steel foundations specialist Smulders has shared a video showing the construction of the eleven suction bucket jacket foundations for Vattenfall’s European Offshore Wind Deployment Centre (EOWDC) in Aberdeen Bay, Scotland.

Smulders will carry out the final assembly of the eleven foundations at its manufacturing facility in Newcastle.

The company was awarded the EOWDC contract by Boskalis which is the overall Tier 1 supplier of the project’s offshore balance of plant (BoP) work for the construction and installation (EPCI) of the offshore infrastructure including the foundations and cabling.

Boskalis expects the jackets to be installed at the site some three kilometres off Aberdeen in January 2018, which will be followed by the installation of the 66kV inter-array cables and the export cable.

The eleven MHI Vestas 8.4MW turbines are scheduled for installation in March 2018.

As Scotland’s largest offshore wind test and demonstration centre, the 92.5MW EOWDC will trial next generation technology and is expected to contribute to driving down the cost of clean power.

The wind farm is expected to generate first power in summer 2018 and operate for 20 years.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

20 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

21 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

20 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

21 days ago