offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Turbine Switch at Bay of Saint-Brieuc to Be Approved Soon
Wind Farm Update

September 20, 2017 · about 9 years ago

Turbine Switch at Bay of Saint-Brieuc to Be Approved Soon

Following Siemens Gamesa’s decision to replace Adwen’s 8MW turbines, proposed to be installed at three French offshore wind farms, Ailes Marines informed it had sought the approval from the French Minister for the Ecological and Inclusive Transition, Nicolas Hulot, with the decision expected shortly

2 minutes read
  • LinkedIn
  • X
  • Email

Following Siemens Gamesa’s decision to replace Adwen’s 8MW turbines, proposed to be installed at three French offshore wind farms, Ailes Marines informed it had sought the approval from the French Minister for the Ecological and Inclusive Transition, Nicolas Hulot, with the decision expected shortly.

Siemens Gamesa, now the owner of Adwen, has announced that it will discontinue the manufacturing of Adwen’s AD8 model as it wants to focus its offer only on one 8MW platform. Subsequently, the company plans to replace the AD8 turbine at three French projects for which the model was selected with Siemens D8 offshore wind turbine.

The switch for the projects being developed by Eoliennes en Mer Iles d’Yeu et de Noirmoutier and Eoliennes en Mer Dieppe Le Tréport has been approved by the French Minister for the Ecological and Inclusive Transition after review by the Energy Regulation Commission (CRE), while the change for the Bay of Saint-Brieuc project is under the approval process.

Ailes Marines reported that Siemens Gamesa informed it of the decision to stop manufacturing the AD8 wind turbine, selected by Ailes Marines in 2014. In light of this change, Ailes Marines has sought approval from the French Minister for the Ecological and Inclusive Transition, Nicolas Hulot. The developer expects a decision to be brought in the coming weeks.

Ailes Marines pointed out that the proposed change of wind turbine model will not alter the calendar for the development of the Saint-Brieuc project and that the project will also retain its technical features.

The Bay of Saint-Brieuc offshore wind farm will comprise 62 wind turbines mounted on jacket foundations, one offshore substation, as well the associated cables.

Emmanuel Rollin , project director, commented on the turbine model switch and the industrial plan set out by Adwen and confirmed by Siemens Gamesa: “Ailes Marines is totally confident in the technological choices of its supplier Siemens Gamesa Renewable Energy. The confirmation of the industrial plan announced and their willingness to continue to associate local companies with the manufacturing of this turbine contribute positively to the development and the constitution of the offshore turbine industry in France” .

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

20 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

21 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

20 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

21 days ago