offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›OWA Access to Study Active Fender Systems
Contracts & Tenders

September 27, 2017 · about 8 years ago

OWA Access to Study Active Fender Systems

As part of the Offshore Wind Accelerator (OWA) program, Carbon Trust has issued a tender seeking companies interested in undertaking a study to provide a reference document for active fender systems.

1 minutes read
  • LinkedIn
  • X
  • Email

As part of the Offshore Wind Accelerator (OWA) program, Carbon Trust has issued a tender seeking companies interested in undertaking a study to provide a reference document for active fender systems.

The objective of the Active Fender Systems project is to provide the reference document for active fender systems describing the range of systems available, their characteristics, and identifying promising future concepts that could improve the performance of offshore wind vessels.

An assessment of different fender arrangements and systems will allow operators to improve safety, increase productivity and reduce cost.

The fender design is crucial for conventional crew transfer vessels to access offshore wind turbines, affecting both the transfer capability and the impact between the vessel and the turbines. Improved or optimised design could therefore lead to reduced impacts and increased vessel performance, the Carbon Trust pointed out.

The OWA Access addresses the fact that there are numerous fenders and fender systems available on the market and new and innovative systems are being introduced with no current way of comparison or benchmarking. Hence, the understanding of the performance of fender systems is important in ensuring access to turbines, especially in harsher sea conditions further offshore.

The deadline for tender submissions is at 23:59 (BST) on 20 October 2017.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & Tenders

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction
Authorities

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction

27 days ago

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

28 days ago

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

28 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction
Authorities

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction

27 days ago
Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

28 days ago
Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

28 days ago