offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Sif’s Rotterdam Assembly & Coating Facility Officially Open
News

October 3, 2017 · about 8 years ago

Sif’s Rotterdam Assembly & Coating Facility Officially Open

On 29th September, the Dutch Minister of Economic Affairs, Henk Kamp, officially opened Sif’s new assembly and coating facility at the Maasvlakte 2 terminal in the Port of Rotterdam.

2 minutes read
  • LinkedIn
  • X
  • Email

On 29th September, the Dutch Minister of Economic Affairs, Henk Kamp, officially opened Sif’s new assembly and coating facility at the Maasvlakte 2 terminal in the Port of Rotterdam.

The new facility will increase Sif’s annual capacity from 225 kilotons to 300 kilotons. Components manufactured at the Roermond site can be assembled at the Rotterdam facility into complete monopiles with a diameter of up to 11 meters, a length of 120 meters, and a weight of around 2,000 tons.

Once the complete monopiles have been coated in the four separate blasting and painting rooms, they are stored on the facility’s 103-acre grounds until delivery via the specially constructed quay.

The grounds can accommodate the simultaneous loading of two installation ships of monopiles and transition pieces.

The facility is currently equipped with two fully operational production lines, which have the capacity to produce four complete monopiles per week.

The project took a total of approximately 30 months to complete, from the signing of the partnership agreement between Sif and Port of Rotterdam in March 2015 and the launch of production in September 2016 up to and including the commissioning of the second production line and the facility’s official opening this year. The operation coincided with the upgrade of the production facilities at Sif’s Roermond site.

This marks the completion of an investment program involving an amount of roughly EUR 90 million, created by Sif to enable offshore wind farm developers to start using a new generation of wind turbines with larger capacities.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago