offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›VOS Stone Books Another Arkona OWF Gig
Vessels

October 10, 2017 · about 8 years ago

VOS Stone Books Another Arkona OWF Gig

VBMS has awarded Vroon’s subsea-support walk-to-work vessel VOS Stone a contract to support inter-array cabling operations at the 385MW Arkona offshore wind farm from spring 2018.

1 minutes read
  • LinkedIn
  • X
  • Email

VBMS has awarded Vroon’s subsea-support walk-to-work vessel VOS Stone a contract to support inter-array cabling operations at the 385MW Arkona offshore wind farm from spring 2018.

Recently, E.ON awarded VOS Stone a contract for logistics support and offshore accommodation at Arkona starting from summer 2018.

The vessel was delivered by Fujian Southeast Shipbuilding of China in July and is currently undergoing final outfitting works in the Netherlands, in readiness for North Sea operations from November 2017.

E.ON and Statoil are building the EUR 1.2 billion Arkona wind farm some 35 kilometres northeast of the Rügen Island. E.ON is responsible for the construction and subsequent operation of the wind farm.

Arkona will comprise 60 Siemens 6MW turbines scheduled for commissioning in 2019.

VOS Stone is a sister vessel of VOS Start, currently employed at DONG Energy’s Walney Extension offshore wind farm in the Irish Sea. Like her sister, VOS Stone has been fitted with a motion-compensated offshore gangway and a 50T active-heave-compensated crane. She can provide accommodation for 60 client personnel.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

14 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

14 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago