offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›First Merkur Nacelles Arrive in Eemshaven
Vessels

November 6, 2017 · about 8 years ago

First Merkur Nacelles Arrive in Eemshaven

BigLift’s heavy load carrier Big Sky has arrived in the Port of Eemshaven in the Netherlands loaded with the first six of the sixty-six GE Haliade nacelles to be installed on the 396MW Merkur offshore wind farm in the German North Sea.

1 minutes read
  • LinkedIn
  • X
  • Email

BigLift’s heavy load carrier Happy Sky has arrived in Eemshaven in the Netherlands loaded with the first six of the sixty-six GE Haliade nacelles built for the 396MW Merkur offshore wind farm in the German North Sea.

The Haliade 150-6MW nacelles were manufactured at GE’s facility in Saint-Nazaire, France, and loaded onto the vessel at the Nantes Saint-Nazaire Port.

The Big Sky departed Saint-Nazaire on Saturday, 04 November, with AIS data showing the vessel arriving in Eemshaven in the morning hours of Monday, 6 November.

The remaining sixty nacelles will also be shipped from Saint-Nazaire to GE’s logistical operations hub in Eemshaven from where the installation of the wind turbines is expected to start in spring 2018.

The blades, built by LM Wind Power, will be shipped out from the Port of Castellón in Spain to Eemshaven.

The Merkur offshore wind farm, located approximately 35km north of the island of Borkum in Germany, is expected to be completed by the end of 2018.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago