offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Final Arkona Monopile Goes For a Splash
Wind Farm Update

November 8, 2017 · about 8 years ago

Final Arkona Monopile Goes For a Splash

On Tuesday, 7 November, the 60th and final monopile built for the Arkona offshore wind farm was lowered into water at the port basin of EEW Special Pipe Constructions GmbH prior to being towed to the installation site some 35 kilometres northeast of the Rügen Island in the German Baltic Sea.

1 minutes read
  • LinkedIn
  • X
  • Email

On Tuesday, 7 November, the 60th and final monopile built for the Arkona offshore wind farm was lowered into water at the port basin of EEW Special Pipe Constructions GmbH prior to being towed to the installation site some 35 kilometres northeast of the Rügen Island in the German Baltic Sea.

The monopiles, manufactured by the Rostock-based EEW SPC, are sealed at both ends, launched and floated to the construction site.

There, Van Oord’s heavy-load crane ship Svanen then hammers the 81-metre monopiles 40 metres deep into the seabed. The first monopile was floated over and installed in August.

Svanen will also install the transition pieces manufactured by Bladt Industries.

The Arkona wind farm, a joint venture between E.ON and Statoil, comprises 60 Siemens 6MW turbines, which A2SEA will start installing in 2018.

The wind farm, also known as Arkona-Becken Südost, is expected to be fully commissioned in 2019.

CORRECTION NOTE : The original article was amended on Thursday, 9 November. The original article stated that the final monopile was lowered into water at the Mukran Port in Sassnitz and not the port basin of EEW SPC.

In addition, the photo initially accompanying the article was replaced with EEW SPC’s press image.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

21 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

22 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

21 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

22 days ago