offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Ørsted Seeks Cable Layers for Dutch Offshore Wind Farms
Contracts & Tenders

November 13, 2017 · about 8 years ago

Ørsted Seeks Cable Layers for Dutch Offshore Wind Farms

Ørsted, former DONG Energy, has issued a tender for cable lay ship services at offshore wind farms in the Dutch North Sea.

2 minutes read
  • LinkedIn
  • X
  • Email

Ørsted, former DONG Energy, has issued a tender for cable lay ship services at offshore wind farms in the Dutch North Sea.

Ørsted is seeking companies for the installation of array cables, including rock dumping, for the Borssele 1 and 2 and Hollandse Kust (zuid) I and II offshore wind farms.

In addition, the tender for the Hollandse Kust (zuid) may be cancelled if Ørsted does not win the auction for the project, expected to be awarded in the first quarter of 2018, the company said.

The company will use the Achilles Utilities Nordics and Central Europe (AUNCE) qualification system for the tender , and invites suppliers to register as soon as possible and before 15 calendar days as from 10 November. If not registered within this period, Ørsted emphasises that suppliers may not be able to participate in the tender procedure.

Ørsted won the concession rights to build the 752MW Borssele 1 and 2 in July 2016 , at the project site located 22km from the coast of the Dutch province of Zeeland. In July, the company signed an agreement with Siemens Gamesa for the supply and maintenance of 94 8MW turbines, followed by signing of a grid connection agreement with TenneT.

Borssele is scheduled for commissioning by the end of 2020.

The Hollandse Kust (zuid) sites I and II have a planned capacity of 700MW, and further 700MW at sites III and IV. In October, the Dutch Ministry of Economic Affairs published the Ministerial Order for permitting offshore wind energy for Hollandse Kust (zuid) I and II, with the application period starting on 15 December and closing on 21 December 2017.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersGrid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

19 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

20 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

19 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

20 days ago