offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›RVO.nl Issues Hollandse Kust (noord) Geotechnical Soil Investigations Tender
Business & Finance

November 28, 2017 · about 8 years ago

RVO.nl Issues Hollandse Kust (noord) Geotechnical Soil Investigations Tender

Netherlands Enterprise Agency (RVO.nl) has informed about an upcoming invitation to tender for geotechnical soil investigations on the Hollandse Kust (noord) offshore wind farm zone in the Dutch North Sea.

2 minutes read
  • LinkedIn
  • X
  • Email

Netherlands Enterprise Agency (RVO.nl) has informed about an upcoming invitation to tender for geotechnical soil investigations on the Hollandse Kust (noord) offshore wind farm zone in the Dutch North Sea.

The tender , valued at EUR 4 million, is divided into two lots and is planned to be opened on 18 December.

The first lot carries between 25% and 35% of the total value and covers a seabed PCPTs campaign with a target depth of 50-60 meters, while the second lot includes continuous sampling PCPT boreholes with a target depth of 50-80m and seismic PCPT boreholes with a target depth of 50-60 m; vibrocoring; MIC testing; a laboratory testing programme (cyclic and static) on the obtained soil samples; and creating a detailed geological ground model.

The 700MW Hollandse Kust (Noord) area is the last of the three North Sea wind farm zones to be surveyed as part of the Dutch government’s Offshore Wind Energy Roadmap programme.

The Netherlands has six offshore wind sites in the pipeline at the two Hollandse Kust zones : four at Hollandse Kust Zuid, and two at Hollandse Kust Noord. Each of the sites at the wind farm zones can accommodate 350MW.

The subsidy and permit tender for Hollandse Kust Zuid I and II (totalling 700MW) is scheduled to open on 15 December 2017, with the tender for the zones III and IV (700MW) to follow in 2018.

The Hollandse Kust Noord (700MW) subsidy and permit tender is scheduled for 2019.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceContracts & TendersWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago