offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Jumbo’s Fairplayer Installing Arkona TPs, Equipped with SMST Gangway
Vessels

December 4, 2017 · about 8 years ago

Jumbo’s Fairplayer Installing Arkona TPs, Equipped with SMST Gangway

Jumbo’s Heavy Lift Crane Vessel (HLCV) Fairplayer is now installing transition pieces (TPs) at the Arkona offshore wind farm. The vessel was outfitted with an SMST gangway shortly before the works started in early November, according to SMST.

1 minutes read
  • LinkedIn
  • X
  • Email

Jumbo’s Heavy Lift Crane Vessel (HLCV) Fairplayer is now installing transition pieces (TPs) at the Arkona offshore wind farm. The vessel was outfitted with an SMST gangway shortly before the works started in early November, according to SMST.

Since all of the transition pieces will be installed floating in DP2 mode , the use of a compensated gangway is necessary, SMST said, adding that continuous access provided by the modular Telescopic Access Bridge M Series supports the project’s efficiency for walk-to-work operations.

The installation of monopiles at the Arkona offshore wind farm site has been completed ahead of schedule, allowing for an early start of the installation of the transition pieces , produced by Bladt Industries, with all 60 expected be in place at the beginning of 2018.

In the spring of 2018, the offshore transformer station built in cooperation with the grid operator 50Hertz will be transported to the Arkona construction site and installed.

The installation of the 60 Siemens 6MW turbines is scheduled to start in 2018, and the Arkona wind farm is expected to be commissioned in 2019.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

14 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

14 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago