offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›GE Hires Manor Renewable Energy for Merkur Works
Contracts & Tenders

December 6, 2017 · about 8 years ago

GE Hires Manor Renewable Energy for Merkur Works

Manor Renewable Energy (MRE) has won a contract to supply temporary power, personnel and a multi-purpose vessel to GE Renewable Energy for the Merkur offshore wind farm in the German North Sea.

1 minutes read
  • LinkedIn
  • X
  • Email

Manor Renewable Energy (MRE) has won a contract to supply temporary power, personnel and a multi-purpose vessel to GE Renewable Energy for the Merkur offshore wind farm in the German North Sea.

Under the contract, MRE will provide temporary power pods, designed and manufactured in-house, with a 2000L integrated fuel tank to reduce the refueling and vessel intervention of smaller tanks.

“The German market is key for MRE and the Merkur OWF is now our sixth project in the last 3 years and we are hugely excited to be working with a new client in GE Renewable Energy,” MRE Director, Toby Mead , said.

“We look upon each project as a different challenge and work hard to deliver the perfect solution; with us owning a large range of generators, a new build vessel and working with the leading offshore technicians, this temporary power offering is interface-free, which at present is setting us apart.”

The 396MW Merkur offshore wind farm, owned by Merkur Offshore GmbH, is currently being constructed 45km from the island of Borkum.

The wind farm, comprising 66 GE Haliade 150-6MW turbines, is expected to be completed by the end of 2018 and fully operational in 2019.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersOperations & MaintenanceVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago