offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›CSIC Installs Two 5MW Wind Turbines Off Fujian Province
Technology

December 22, 2017 · about 8 years ago

CSIC Installs Two 5MW Wind Turbines Off Fujian Province

Chinese wind turbine manufacturer and offshore wind farm developer, CSIC (China Shipbuilding Industry Corporation) HaiZhuang Windpower, informed on 21 December that two of its H128-5MW wind turbines are now installed off in Fujian Province and connected to the grid.

1 minutes read
  • LinkedIn
  • X
  • Email

Chinese wind turbine manufacturer and offshore wind farm developer, CSIC (China Shipbuilding Industry Corporation) HaiZhuang Windpower, informed on 21 December that two of its H128-5MW wind turbines are now installed off in Fujian Province and connected to the grid.

The company’s 5MW platform includes models with 128m, 151m, and 171m rotor diameters.

For the H151-5MW, CSIC signed a strategic collaboration agreement with LM Wind Power in November 2016, under which LM is delivering blades for the turbine.

The first 5MW wind turbine with a rotor diameter of 171m was assembled in Jiangsu on August 11, with the Design Assessment for the model issued recently.

CSIC is developing the Jiangsu Rudong 300MW offshore wind farm, off Jiangu Province, for which the onshore construction started this year. The wind farm will comprise the H151-5MW turbines.

Offshore WIND Staff

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

TechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

17 days ago