offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Update: EOWDC Transformer Arrives at Blackdog
Grid Connection

January 4, 2018 · about 8 years ago

Update: EOWDC Transformer Arrives at Blackdog

The transformer for Vattenfall’s European Offshore Wind Deployment Center (EOWDC) arrived at the Blackdog substation site in Aberdeenshire, Scotland, on 3 January.

1 minutes read
  • LinkedIn
  • X
  • Email

The transformer for Vattenfall’s European Offshore Wind Deployment Center (EOWDC) arrived at the Blackdog substation site in Aberdeenshire, Scotland, on 3 January.

The arrival of the 92.6 tonne transformer in the UK follows a voyage from its manufacturing site in Tapioszele, Hungary, by road via Austria and Germany to Rotterdam, the Netherlands, from where it was shipped to Teesport, North Yorkshire, for its final journey.

The transformer will convert the electricity from 66Kv to 132Kv, which will be transported from the Blackdog substation site to Dyce substation.

The 92.4MW EOWDC, also known as Aberdeen offshore wind farm, will comprise eleven MHI Vestas 8.4MW turbines scheduled for installation in March 2018.

The wind farm is expected to generate first power in summer 2018 and operate for 20 years.

Images: Vattenfall

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago