offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›KCI and Tractebel Join Hands in French Offshore Wind Projects
Contracts & Tenders

January 29, 2018 · about 8 years ago

KCI and Tractebel Join Hands in French Offshore Wind Projects

KCI The Engineers is supporting Tractebel at the Dieppe et Le Tréport and Iles d’Yeu et de Noirmoutier offshore wind farms in France by providing the structural know-how to the engineering team for the offshore substations. KCI’s scope will be to assist by setting up the engineering packages for the

1 minutes read
  • LinkedIn
  • X
  • Email

KCI The Engineers is supporting Tractebel at the Dieppe et Le Tréport and Iles d’Yeu et de Noirmoutier offshore wind farms in France by providing the structural know-how to the engineering team for the offshore substations.

KCI’s scope will be to assist by setting up the engineering packages for the OSS topsides and foundations from a structural point of view and providing technical expertise to the owner of the wind farms.

According to the company, the complementary expertise of Tractebel and KCI will help project owner Les Eoliennes en Mer Services (LEMS), a joint venture partnership between Engie, EDP Renewables and La Caisse des Dépôts, to bring these projects a step closer to realization.

The 496MW Dieppe et Le Tréport offshore wind farm is located 16km from Dieppe and 15km from Tréport, in water depths ranging from 5 to 25m. The 496MW Iles d’Yeu et de Noirmoutier wind farm project is located 11.6km from the island of Yeu and 16.5km from Noirmoutier, in water depths varying from 17 to 35m.

Each wind farm will comprise 62 Siemens Gamesa 8MW wind turbines and an offshore substation.

Construction and installation of Dieppe et Le Tréport and Iles d’Yeu et de Noirmoutier will begin in 2019, with commissioning expected in 2021. The two wind farms will remain in operation until 2041.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersGrid ConnectionOperations & MaintenanceR&DWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

13 days ago