offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›Germany Sets Out Offshore Wind Tender Rules
Authorities

January 30, 2018 · about 8 years ago

Germany Sets Out Offshore Wind Tender Rules

Germany’s Federal Network Agency (Bundesnetzagentur) has announced the terms of the second competitive tender for grid connection and offshore wind farm compensation.

2 minutes read
  • LinkedIn
  • X
  • Email

Germany’s Federal Network Agency (Bundesnetzagentur) has announced the terms of the second competitive offshore wind tender.

The tender volume amounts to 1,610MW, comprising the 1,550MW volume set out in the Offshore Wind Energy Act, plus 60MW additional capacity not awarded in the first call for tenders in April 2017.

The maximum bid threshold in the second tender was lowered from EUR 0.12 ct/kWh to EUR 0.1/ kWh. The projects which competed in the first tender round and which had a negative value bid have been excluded for the second tender round, the agency said. The contract will be awarded to the projects with the lowest bid values, i.e. the lowest subsidy requirement.

Unlike the first tendering procedure, bids from offshore wind farms in the Baltic Sea will have a preferential status in this round, the agency said.

The so-called “Baltic Sea quota” calls for a minimum of 500MW to be awarded for offshore wind farms in the Baltic Sea, as required by the Offshore Wind Energy Act.

The second call for tenders will open on April 1, 2018, the agency said.

It will be eligible for offshore wind farms that have been approved before August 2016 or have an advanced approval status and will be operational after December 31, 2020. Further requirements relate to the location of the offshore wind farms within the North and the Baltic Sea.

The bids are to be submitted to the Federal Network Agency in Bonn by April 3, 2018.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesBusiness & FinanceContracts & TendersGrid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

16 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

16 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

19 days ago