offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Photo of the Day: Acta Auriga Taking Final Shape
Operations & Maintenance

January 31, 2018 · about 8 years ago

Photo of the Day: Acta Auriga Taking Final Shape

Ulstein has shared a photo of Acta Marine’s service operation vessel (SOV) Acta Auriga under construction at Ulstein Verft.

1 minutes read
  • LinkedIn
  • X
  • Email

Ulstein has shared a photo of Acta Marine’s service operation vessel (SOV) Acta Auriga under construction at Ulstein Verft.

Ulstein is currently conducting outfitting and commissioning of the Acta Auriga in Ulsteinvik, Norway.

Acta Auriga recently won a contract to service Offshore Breeze Energy’s Bard Offshore 1 wind farm in the German North Sea. The two-year charter will see the vessel perform logistical support for maintenance activities at the 400MW wind farm, operating out of Emden.

The 93.4 meter long Acta Auriga is an Ulstein-designed X-bow & X-stern DP2 OSV equipped with SMST motion compensated gangway with integrated elevator and crane functionality. It is able to perform 3D compensated lifts with its 6t SMST 3D crane and is equipped with a fuel-efficient drive system.

The vessel comprises covered warehousing facilities, integrated people and cargo logistics and stepless approach to the offshore installations. A total of 120 people can stay onboard in its 80 cabins.

Ulstein is expected to deliver the vessel at the end of Q1 2018, after which it will undergo trials and commence its works at the offshore site.

Upon delivery, Acta Auriga will join Acta Orion, her semi-sister vessel, and as such form the second vessel in the Acta fleet dedicated for W2W, offshore logistics and accommodation services for clients in the offshore renewable industry.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago